during construction our Basketball court(outdoor) it was felt that a minimum slope of 1:1000 may be provided transversely and a minimum slope of 1:500 may be provided longitudinally to drain off the rain water. and the slope may be adjusted according to the rainfall intensity at that area
Chat with our AI personalities