Building an Olympic-sized swimming pool typically takes around 6 to 12 months, depending on various factors such as location, design complexity, weather conditions, and the construction team's experience. This timeline includes site preparation, excavation, installation of necessary infrastructure, and finishing touches. However, this duration can vary widely based on specific project requirements and local regulations.
Neither. Say, "25 metre pool".
164.041995 feet
In the London 2012 Olympic Games the pool is 50 m length.
An olympic swimming pool is 2m deep, 50m long and 25m wide.
A semi-olympic pool is 25 meters long by 12.5 meters wide with a depth of between 1.2 and 1.6 meters.
The pool is standard Olympic size: 50 meters The pool is standard Olympic size: 50 meters
50 meters .
50 meters
50 m
That depend on where you put it and what you use to build it
I am assuming by professional, you mean Olympic size. An Olympic size pool is 50 meters. The most common lap pool is 25 yards.
Olympic Sized/Long Course -- 50m Shortcourse -- 25m