Well, darling, to convert cost per square meter to cost per lineal meter, you need to know the width of the material. Once you have that, simply divide the cost per square meter by the width in meters to get the cost per lineal meter. It's as easy as pie, honey. Just remember, math doesn't have to be boring!
The cost to surface a track can vary depending on the type of surface being used and the area you are located in. On average, it can range from $10 to $50 per square meter for materials and labor. Additional costs may be incurred for site preparation and maintenance.
10 centimeters = 0.10 meters At 2.50 per meter, it would cost 0.25
To convert square yards to square meters, multiply by 0.8361. Therefore, a square meter of carpet would cost approximately $11.91 (9.99/0.8361).
The cost would be ($25) multiplied by (the number of square meters to be carpeted).
10cents per meter
The total cost for 0.75 meters of chain at $4.80 per meter would be $3.60. This is calculated by multiplying the length of chain (0.75 meters) by the cost per meter ($4.80).
5 x 3 = 15 15 x 150 = 2,250
0, because a lineal meter has an area of 0
You need the width of the base board.
about 1 million
That would depend what information you are given. The cost of floor tiling is often already expressed per square meter. If you know the total cost of a certain floor, you can divide by the area to get the cost per square meter.