answersLogoWhite

0


Best Answer

electronic timing

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What was introduced into the olympic games before the other two flame podium electrical timing equipment?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What electrical equipment be tested for before it is used?

Any test equipment that your life may depend on when using it must first be tested before being used. These types of test equipment usually have internal apparatus that can verify that the equipment is working perfectly before it is used by personnel. Linesmen use this type of test equipment before working on primary voltage lines.


Why should you avoid bodily contact with ground while working on live electrical equipment?

No-one should work on live electrical equipment without training, and the training would answer that question. Always turn equipment off and unplug before doing any work.


Which IS a common sense safety procedure that can help prevent electrical accidents?

The main safety rule is to switch off at the mains before working on electrical equipment and wiring.


Electrical safety test should be carried out whenever electrical equipment is commissioned?

Test and inspection of electrical equipment should always be carried out when commissioning . This will done before voltage is applied , usually known as dead testing to verify the suitability . Live testing will then be carried out to confirm compliance with regulations .


What must electrical equipment be tested for before it is used?

Any test equipment that your life may depend on when using it must first be tested before being used. These types of test equipment usually have internal apparatus that can verify that the equipment is working perfectly before it is used by personnel. Linesmen use this type of test equipment before working on primary voltage lines.


How do you get a Qatar electrical license when you need to have that procedure?

Apply for a license from Qatar General Electricity & Water Corporation "KAHRAMAA". It is a test and interview based on the Regulations for the Installation of Electrical Wiring, Electrical Equipment and Air Conditioning equipment. (Based on IEE and BS 7671 ) you can find the regulation, but you have to be in Qatar before applying.See related link below.


When did Nikola Tesla invent the ac motor?

Tesla introduced his motors and electrical systems in a classic paper, "A New System of Alternating Current Motors and Transformers" which he delivered before the American Institute of Electrical Engineers in 1888.


Was the titanic built before Olympic?

Olympic was first


What is the purpose of 'Load Test' in Electrical Power Engineering?

A load test is used to confirm that a manufacured piece of equipment is working correctly before it leaves the factory.


What should you do before using electrical equipment?

Any test equipment that your life may depend on when using it must first be tested before being used. These types of test equipment usually have internal apparatus that can verify that the equipment is working perfectly before it is used by personnel. Linesmen use this type of test equipment before working on primary voltage lines.


What best practice to avoid electrical shock?

Never place items, especially metal utensils, inside an electric appliance while it is plugged into a wall outlet.Children tend to stick paper clips or other small items they find in electrical outlets.Never forget -- water and electricity don't mix.Inspect wiring of equipment before each use. Replace damaged or frayed electrical cords immediately.Know the location and how to operate shut-off switches and/or circuit breaker panels. Use these devices to shut off equipment in the event of a fire or electrocution.Use safe work practices every time electrical equipment is used.Use only multi-plug adapters equipped with circuit breakers or fuses.


What happens to the Olympic flame before the start of the Olympic games?

it gets lit