answersLogoWhite

0

Venues Olympics 2012

User Avatar

Anonymous

13y ago
Updated: 8/18/2019

Aquatics Centre, Basketball Arena, BMX Ttrack, Box Hill, Brands Hatch, City of Coventry Stadium, Copper Box, Earls Court, Eton Dorney, Eton Manor, ExCel, Greenwich Park, Hadleigh Farm, Hampden Park, Hampton Court Palace, Horse Guards Parade, Hyde Park, Lee Valley White Water Centre, Lord's Cricket Ground, Millennium Stadium, North Greenwich Arena, Old Trafford, Olympic Park, Olympic Stadium, Riverbank Arena, St. James' Park, The Mall, The Royal Artillery Barracks, Velodrome, Water Polo Arena, Wembley Arena, Wembley Stadium, Weymouth & Portland, Wimbledon.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

How many venues are there for the 2012 Olympics?

34 venues


Where are the venues for the 2010 Olympics in London?

The Olympics will be in London in 2012 and not 2010


What is going to be built for the London 2012 Olympics?

Venues.


Where are the Olympic games held in England?

The 2012 Olympics will be held at several venues across Greater London.


Which venues are being used outside England for the 2012 Olympics?

Hampden Park (in Glasgow) and the Millenium Stadium (Cardiff).


Where are some of the venues going to be in the 2012 Olympics?

City of Coventry Sadium, Olympic Stadium, Millennium Stadium, Wembley Stadium.


How many people will be at the 2012 Olympics?

Estimate vary considerably. But certainly over a million will attend at the various venues over the period.


Where in London will the 2012 Olympics be?

It will be centered in Olympic Stadium and several venues around it. See the link for more information on Olympic Stadium.


What are the 34 venues in the 2012 London Olympics?

34 does not correctly reflect the breakdown of the 302 events that are divided into 26 sports and 39 disciplines


How many venues in 2012?

34


Is there cricket in 2012 Olympics?

Not only in 2012 Olympics, cricket is not featured in Olympics


How much did it cost for the Olympics 2012?

Well over 15 Billion for building the venues and infrastructure, and redeveloping the land for the Olympic Park. The costs of mounting the Games are separate from the location costs. While the Games are privately funded, the venues and Park costs are met largely by public money.