answersLogoWhite

0

The height of the basket can be seen at the link below

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

How do you calculate invert level of existing pipe?

The invert level of an existing pipe is the result when you subtract the depth/height of the lowest elevation/level of the inside/inner portion of the existing pipe from the surface reference elevation most commonly known as benchmark (BM). Benchmark (BM) can usually be found on permanent structure in the surface/ground.


Was basketball based on an existing game?

No, basketball wasnt' based on an existing game. Basketball was a completely new game, where people tied two baskets (peach baskets) to two walls opposite to each other, and dribbled and tossed a soccer ball into the baskets. There wasn't anything like it at the time.


What is a long section survey in engineering survey?

A long section survey in engineering surveying is a graphical representation of a terrain profile along a specific linear path. It typically includes elevation data and features such as ground profiles, existing structures, and proposed works to aid in design and construction planning. Long section surveys are commonly used in civil engineering projects like road and railway design.


Does creating a local representation of an existing domain user account grants a network user the ability to access local resources on Windows XP Pro network?

Yes


What three 3 conditions must be present in order for misrepresentation or concealment to prevent recovery under an insurance policy?

(1) The defendant made a false representation of a past or existing material fact susceptible of knowledge. (2) The defendant did so knowing the representation was false, or without knowing whether it was true or false. (3) The defendant intended to induce the plaintiff to act in reliance on that representation.


What is considered a false pretense?

A false pretense is such a fraudulent representation of an existing or past fact by one who knows it not to be true as is adapted to induce the person to whom it is made to part with something of value.


Where do I measure so my garage will not be taller than my existing structure?

Measure the ceiling height on the inside of the room closest to the new structure. This will be your "plate" height. Meaning your top plate on the new stud wall will be at that height. This will not account for the difference in elevation between your existing slab and the proposed construction site.


How can I ensure that the new sod I am installing is higher than the existing grass for optimal growth and integration?

To ensure that the new sod is higher than the existing grass for optimal growth and integration, you can prepare the soil by leveling it and adding a layer of topsoil before laying the sod. This will help create a slight elevation for the new sod to establish itself and integrate well with the existing grass.


What did Mr Brearly suggest they do to solve the problem of representation to the legislature?

That a map of the U. S. be spread out, that all the existing boundaries be erased, and that a new partition of the whole be made into 13 equal parts.


What is the Tagalog of existing?

Tagalog translation of EXISTING: umiiral


What is glamour all about?

Glamour is about existing. Existing gracefully.


Which is the correct spelling preexisting or pre-existing?

pre-existing